Project Description

PSNH Merrimack Gypsum Storage Building

PROJECT TYPE: Supply & Erect

PROJECT LOCATION: Bow, NH

CONSTRUCTION TYPE: Butler® Widespan™

SQUARE FOOTAGE: 27,328 sq. ft.

END USE: Gypsum Storage Building

PROJECT DESCRIPTION: This project included the supply and erection of an approximately 27,000 square foot building that will be used to house gypsum.  The gypsum is a byproduct of one of the processes installed to remove emissions from the coal burning plant.

The heavy structure was designed to support the conveyor systems installed by Dutton & Garfield, Inc. and supplied by Dearborn Mid-West Conveyor.

We Are Here to Help You On Your Next Project

Contact us at 603-329-5300 or fill form below:

Thank you for your message. It has been sent. A Dutton & Garfield representative will contact you soon.
There was an error trying to send your message. Please try again.